- CA ON00239 F1411-S3-31
- Item
- May 1830
Parte de Kingston Picture collection
Brewer's Upper Mills. Upper lock partly built. Excavations, embarkments in progress. Watercolour.
Parte de Kingston Picture collection
Brewer's Upper Mills. Upper lock partly built. Excavations, embarkments in progress. Watercolour.
Parte de Kingston Picture collection
Old Saw Mill at Kingston Mills. Locks in progress of Construction, 1830.
Parte de Kingston Picture collection
Masonry of three lower locks at Kingston Mills completed. Watercolour.
Parte de Kingston Picture collection
View of Great Cataraqui Bay at the south entrance of the Rideau Canal with Kingston in the distance. Taken from the mountain east of the locks at Kingston Mills. Watercolour.
Parte de Kingston Picture collection
Snake Island and the Lower Gap, or entrance to Lake Ontario from Kingston Harbour. Watercolour.
Parte de Kingston Picture collection
Dam at Jones' Falls, when nearly completed, showing the last temporary passage provided for the surplus water (1831). Watercolour.
Parte de Kingston Picture collection
View near the Head of the River Ste. Lawrence, Canada. Fort Henry and Kingston in the distance. Watercolour.
Parte de Kingston Picture collection
Work completed at Brewer's Locks Mill. Watercolour.
Parte de Kingston Picture collection
Bath on the Bay of Quinte and Upper Gap to Lake Ontario. Watercolour.
Parte de Kingston Picture collection
Building of the G.T.R. Bridge at Kingston Mills. Watercolour.